大地资源二中文在线播放_大地资源二中文在线观看官网_大地资源一中文在线观看官网_大地资源中文在线观看官网免费_大地影视资源官网第二页_大地资源二中文在线观看下载

Today:
首頁 > English > News Gallery > Company Everts > Company News

Construction of the pile foundation of the north main tower of Yanji Yangtze River Bridge completed

Source:    Date:2022-09-22  

At 23:00 on September 10, with the last conduit slowly put out of the hole, the construction of the north main tower pile foundation of Yanji Yangtze River Bridge constructed by China Railway Bridge Bureau was all completed, and the cofferdam assembly was about to be carried out.

The main bridge span of Yanji Yangtze River Bridge is 1860 meters long. The bridge across the Yangtze River with one span connecting Ezhou city and Huanggang city, the upper level of the highway, the lower level of the city expressway, designed for different drape four main cable double highway suspension bridge structure system.

North main tower is located in the suburbs of Huanggang city, about 370 meters from the flood control dike, the riverbed geology is complex, the sedimentary construction stratigraphic area with 25 ~ 35 meters super thick cover. High bedrock strength poses great challenges and risks for pile foundation construction. The construction was carried out in accordance with the procedures of bank slope protection, drilling platform erection, inserting shoring, etc. The drilling was synchronized by 10 KTY4000 rotary drilling rigs. The machinery was kept 24 hours a day and the personnel took shifts to ensure that 56 piles of 3.2 meters in diameter and 44 meters in length were completed on schedule. The next step will be to assemble and lower the cofferdam, and to carry out construction work such as bearing platform to ensure that the annual production target is achieved.

up:

next:

仪征市| 台山市| 稷山县| 夏河县| 石城县| 长宁区| 苏尼特右旗| 双鸭山市| 山东| 百色市| 天祝| 化州市| 勃利县| 尖扎县| 贵溪市| 诸城市| 苗栗市| 梁河县| 江川县| 遂平县| 明水县| 库伦旗| 运城市| 丘北县| 仙游县| 志丹县| 望江县| 麻江县| 白城市| 鹤峰县| 星子县| 万荣县| 宝山区| 商丘市| 沙湾县| 吴川市| 安陆市| 韶山市| 仁怀市| 黄陵县| 措勤县|