大地资源二中文在线播放_大地资源二中文在线观看官网_大地资源一中文在线观看官网_大地资源中文在线观看官网免费_大地影视资源官网第二页_大地资源二中文在线观看下载

Today:
首頁 > English > News Gallery > Company Everts > Company News

Hong kong-Zhuhai-Macao Bridge (Section CB05) --The First Pile Cap Πer Shaft Prefabricated Successfully

Source:    Date:2013-02-27  

On 22th of February 2013, the first pile cap pier shaft of Hong kong-Zhuhai-Macao Bridge (Section CB05) was precast successfully at Zhongshan base. The first prefabricated pile cap & pier shaft was cast integrated. The pile cap is 15.6m in length, 11.4m in wide and 4.5m in height; the bottom section of pier shaft is 14.29m. The total quantities of reinforcement and stainless reinforcement are 191t and 37.4t respectively, and that of concrete is 867m3. The total weight of the first pile cap & pier shaft is 2500t.

up:

next:

大荔县| 郯城县| 福贡县| 手机| 清流县| 鄱阳县| 讷河市| 云梦县| 安泽县| 东乡县| 阳原县| 沁阳市| 黑水县| 南华县| 论坛| 澄迈县| 通城县| 靖西县| 郁南县| 长沙县| 三明市| 松阳县| 华宁县| 灵川县| 工布江达县| 新河县| 潜江市| 德保县| 绥江县| 天水市| 涡阳县| 舞阳县| 西乌珠穆沁旗| 马边| 永济市| 东光县| 湛江市| 尼木县| 青冈县| 监利县| 元朗区|