大地资源二中文在线影视观看,大地二资源在线高清免费播放,大地资源二高清在线观看播放,大地资源中文在线观看官网免费,大地影视资源官网第二页,大地资源二中文在线观看下载

Today:
首頁(yè) > English > News Gallery > Company Everts > Company News

MBEC is Awarded with Package No.5 for Phase Ⅰ for Line 14 of Mass Rapid Transit in Guangzhou

Source:    Date:2014-03-11  

On March 5, MBEC is awarded with Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou has a construction period of 852 calendar days. The total length for main line of the project is 6301m and 988m for branch lines which will be undertaken by MBEC 2.

Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou is comprised of the following scope: Structural and Ancillary Works for Xinhe Transit Station and Taiping Station, Viaduct Section for Lijiatang to Xinhe,  Structural and Ancillary Works for Viaduct Section from Xinhe to Taiping, Precast Beams for Taiping Viaduct Section and Curbs. The total length for bridge part is 6.3km having typical span of 40m with maximum span of 150m; Roadway, bridge, drainage, traffic works, diversion works etc. for upgrading works for section K30+240K36+790 for Guangcong Road as well as other works. The bridge works will include 5 nos. pedestrian bridges, 3 nos. interchanges having typical span of 40m and maximum span of 60m.

up:

next:

永城市| 荔波县| 铜川市| 抚远县| 永年县| 株洲县| 牡丹江市| 正阳县| 大关县| 纳雍县| 云龙县| 新龙县| 石渠县| 杨浦区| 黄石市| 天镇县| 龙陵县| 涿州市| 海南省| 庐江县| 周至县| 翼城县| 方城县| 吴桥县| 云浮市| 栾城县| 阜宁县| 长垣县| 舟曲县| 东乡族自治县| 平果县| 巴塘县| 昌吉市| 新民市| 湖州市| 武穴市| 海南省| 平邑县| 濉溪县| 万荣县| 高唐县|