大地资源二中文在线播放_大地资源二中文在线观看官网_大地资源一中文在线观看官网_大地资源中文在线观看官网免费_大地影视资源官网第二页_大地资源二中文在线观看下载

Today:
首頁 > English > News Gallery > Company Everts > Company News

Ma’anshan Yangtze River Bridge Opened to Traffic

Source:    Date:2014-01-13  

Ma’anshan Yangtze River Bridge was officially opened to traffic.


The bridge is one of the national key projects, totally costs RMB 7,078,000,000. With a total length of 36.14km, among which covers the part crossing the Yangtze River of 11km, it was designed in an expressway standard with dual way six lanes. The main bridge crossing the Yangtze River is divided into two parts by the central shoal, the right part and the left part. The right part locating on the Ma’anshan side is the first three-pylon two spans cable-stayed bridge with arch-shape towers in China. While the left part near the Hexian County is a three-pylon two spans suspension bridge, with a length of 1080m, the main span ranks the first among bridges of the same category around the world, and it symbolizes the breakthrough of the span of such category main bridges from 100m to 1000m.


MBEC undertook the construction of the left three-pylon two spans suspension bridge.

up:

next:

桐梓县| 合山市| 大埔县| 玉溪市| 兴仁县| 平武县| 炎陵县| 福鼎市| 犍为县| 南昌市| 汤阴县| 浮山县| 田林县| 阜城县| 武义县| 都江堰市| 泰来县| 绥江县| 军事| 水富县| 夏河县| 宁津县| 庐江县| 株洲市| 南和县| 阿拉善盟| 行唐县| 新绛县| 宁河县| 龙山县| 沭阳县| 湟中县| 奈曼旗| 军事| 桐城市| 宜宾市| 门头沟区| 盐源县| 潼关县| 宁城县| 中方县|